Commercial

88 Wood Street

Client: AIS Ltd

Value: £610,000

Duration: 10 Weeks

As part of a complete office refit; Mectric Solutions were contracted to carry out the supply and installation of 60 new fan coil units, inclusive of BMS integration and supply air, install 4 new WC cores with 2 DDA’s and replace existing lift lobby area ventilation.

Using our great relationships with suppliers and subcontractors Mectric were able to slash lead times during procurement and upscale labour during a tough COVID period. This made it possible to deliver our usual high quality of workmanship within an 8 week period; two weeks earlier than programmed

Christopher Addison House

Client: ISG Ltd

Value: £1.4m

Duration 22 Weeks

ISG awarded Mectric the full Mechanical
and Electrical package at Hackney Borough
Council office building Christopher Addison
House.


The project was a full 4 floor BIM level 2 fit
out inclusive of Boiler Room, VRF Air
Conditioning, Air Handling units for supply
and extract air, numerous toilet cores,
shower rooms and multiple Kitchenettes. A
new cold water tank and booster set was
also supplied to increase the mains water
pressure throughout the building.

Our electrical department undertook the
installation of small power, lighting, lighting
control and lightening protection.

RFIB – Level 12 30 St. Marys Axe

Client: Square Metre

Value: £1.2 million

Duration: 14 Weeks

Mectric Solutions secured its first project with Square Metre at London’s iconic Gherkin building, undertaking the full Cat B M&E works on Level 12.
The D&B project scope included for full strip out and install of HVAC and electrical services, all within a tight 14 week programme.

Within the new HVAC services were Swegon AHU’s, Mitsubishi Electric VRF, Ability Fan Coils, along with mods to the existing BMS, Sprinkler system and fire alarm.

Along with new HVAC services, a brand new Dali Controlled lighting system by Delmatic along with Scene setting services were installed within the modular offices to complete a stylish and sleek design.

The project was managed by our in house M&E site team delivering this prestigious project on time, allowing the client to move into their new office space on schedule and extremely happy with Mectric Solutions workmanship.

Crown Office Chambers

Client: Knight Harwood

Value: £230,000

Duration: 10 Weeks

Knight Harwood instructed Mectric Solutions in August 2018 to undertake the M&E works for the Crown Office Chambers refurbishment in Embankment, London.

Crown Office is one of Britain’s leading set of commercial Barristers Chambers in England, set in Temple along the River Thames, requiring an office to match their high quality, flexible and modern approach to business.

Work included AC/Ventilation, Domestic Hot & Cold water services WC areas, small power and lighting, sub mains, tea point, data access control, CCTV and fire alarm.

Mectric Solutions experience and expertise in Commercial CAT B fit out
was crucial, In designing and providing a modern, slick work space
throughout.

The project was managed throughout the installation by our in house M&E site managers, working alongside Knight Harwood to deliver the CAT B fit out on time.

Rio Tinto – St. James Square

Client: Knight Harwood

Value: £300,000

Duration: 8 Weeks

The Rio Tinto project is an office alteration for the Rio Tinto Group in the historical St James’s Square, London.

The Rio Tinto Group is one of the world’s largest metals and mining corporations.

Therefore a smart and efficient workspace is paramount for all aspects of running a business on this scale.

Mectric Solutions Ltd were employed to develop the existing systems already in place to bring them up to the next level.

This included alterations to the Mechanical systems, consisting of Ventilation, Heating and Water systems, and Electrical systems including Lighting, Power and Data. With changes to the Lighting Controls and BMS to suit the new design.

All these works were carried out efficiently and professional by Mectric Solutions to a standard that is fitting of an office for the highest of clients.
Both the Main Contractor and the Client were very pleased with our work and expressed great interest in working with us again in the future.

Boeing HQ – Victoria

Client: OD Group

Value: £520,000

Duration: 12 Weeks

The Boeing project is a prestigious office location to the Boeing Company and the Headquarters for the “Boeing in the UK” and “Boeing Defence UK” divisions.

Boeing is the world’s leading aerospace company and the largest manufacturer of commercial jetliners and military aircraft.
Therefore an office space that works for a company dealing in areas as large as this is crucial.

Mectric Solutions Ltd were contracted to undertake the mechanical and electrical works required on this project. Our wealth of experience and expertise in the commercial sector meant we could deliver the office space that Boeing required to the standard a company like theirs expects.

The project blended existing and new across multiple phases meaning that productivity to the business was not lost whilst the office space was transformed.

Lighting, Data and Comfort systems were vital for this office space and all systems were integrated seamlessly as managed by ourselves.

Digital Realty

Client: Boxx Projects

Value: £700,000

Duration: 14 Weeks

Mectric Solutions Ltd recently carried out a mechanical project for Digital Realty, a data centre and Global IT solutions company. Digital Realty wanted to redesign the layout of their London office and this meant the existing mechanical arrangements were no longer suitable.

We met with the client to carefully discuss the new scheme and carried out extensive site surveys.

From the information gathered, we used AutoCAD to develop a mechanical systems design that complimented the revised layout. This included HVAC services controlled via a Trend control system.

In order to accommodate the new scheme, we commissioned new fan coil units to be designed and built off site. These were then installed within a narrow timeframe to suit the quick turnaround required by the client.

In addition we installed an air conditioning split unit within the communications room which could be operated independently from the Landlord’s system.

Network Homes

Client: Overbury

Value: £450,000

Duration: 12 Weeks

Solutions were appointed by Overbury
Core to carry out the mechanical package
within this contract


The project consisted of LTHW and CHW fan
coils for heating and cooling, which served the
office space and breakout area An AHU was
installed to supply fresh air to the demise with a
mixture of supply and extract ductwork The
comms room was fitted with CRAC units
providing cooling to the server equipment.


The installation also included a kitchen area
with domestic hot and cold water services, leak
detection and extraction system The WC’s
were a combination of Male, Female and
DDA’s