HFW – 8 Bishopsgate, Level 7-9
Client: ISG
Value: £2.6 Million
Duration: 28 Weeks
MSL were appointed for the full MEP Design Coordination and Installation contractors carrying out the first Fitout at the iconic 8 Bishopsgate building across levels 7-9 for an established law firm client.
The works consisted of a New commercial kitchen on Level 8 with a Supply AHU and Fire rated extract fan distributing Fire rated ductwork to existing smoke extract riser. New & Relocated 4pipe FCU’S distributed through all 3 floors, VAV boxes serving fresh air onto the floor plate with Public health services serving Kitchen, Pantry and local Tea points. Supply and Extract ductwork was installed through with the majority of services exposed.
New Lighting was provided throughout supplemented with feature lighting in the marketing suite. New small power served Floor boxes, Grommets and desk modules from new Distribution boards via UF busbar track. A UPS system was installed for IT backup power and a LV panel was installed for commercial kitchen appliances.
An intelligent lighting control system as installed throughout the Project